Spencer Street Main Sewer

Method: Microtunnelling

Machine: AVN1200

Distance: 610m

Location: Melbourne, VIC, Australia

OVERVIEW

Looking back to June 2018 in Melbourne, Bothar completed a 610m long drive utilising an AVN1200 microtunneling machine – installing a 1499mm OD GRP jacking pipe for a gravity sewer line in the bustling Spencer Street precinct.

Whilst restricted site conditions, community Interaction, traffic management and varied ground conditions were some of the challenges faced, Bothar’s experienced team seamlessly overcame these constraints safely, in a timely manner with minimal disruption.

Now we look forward with the Bothar team excited to be preparing for similar challenging projects in and around the busy Melbourne CBD.